EEE470 PROTECTION PROJECT

EEE470 PROTECTION PROJECT

Enclosed as Figure 1 is a diagram of an Arizona looped 230 kV transmission system which is typical of a system serving a large city. There is remote generation whose power is input to the loop over 2 – 345 kV lines. The voltage is transformed from 345 kV to 230 kV by 3-phase transformer banks T3 and T4. Transformer T1 and T2 step the voltage up at the remote generating site. Figure 2 is a single line diagram of the 230 kV and 345 kV systems, including the series impedance. Note that the data is in per unit on a 100 MVA base, 230 kV and 345 kV bases. The generator and transformer data is given in Section 2.

The Project is divided into 3 parts as follows:

1.0 Build the above system using PowerWorld

Build a simulation of the above system using PowerWorld.

1.1 Time-Over-Current Relay Scheme for a 69 kV Radial System

Design a coordinated time-over-current relay scheme for the radial 69 kV system shown in Figure 3. This radial system is connected to bus 5 of the system shown in Figures 1 and 2. The 69 kV structure configuration and line data is shown in Figure 4. Assume the zero sequence impedance is three times the positive sequence impedance. For minimum fault current calculations assume that the line from bus 5 and bus 9 is out.

Include:

The necessary short circuit studies.

The breaker ratings for B11-B13.

The CT ratios associated with B11-B13.

The tap and time dial settings for CO-8 relays associated with B11-B13.

The basis for the selections in the form of a report.

1.2 Distance Relay Protection System

Design a distance (impedance) protection system to protect the 230 kV line between busses 5 and 9 and to provide remote backup protection for line from bus 5 to bus 6. The 230 kV lines have 954 KCM ACSR conductors. You will need both an impedance ground fault relay and an impedance phase relay. Use mho units.

Include:

Circuit breaker selection.

Instrument transformer selection and connections.

Relay selections and settings.

Validation of your settings for all fault types by calculating the apparent impedance at bus 9 from computer studies for faults at bus 5. Revise your initial settings, if required.

The basis for the selections in the form of an engineering report.

Pertinent computer studies.

2. Generator and Transformer Data

Gen. No. MVA kV___ ____x”d=X1=X2__ _____x0______ Connection

1 333 22kV .08 pu .10 pu Note 2

2 “ “ “ “ “

3 210 230kV .14 pu (Note 1) .24 pu (Note 1) Note 3

4 “ “ “ “ “

5 “ “ “ “ “

6 353 “ .34 pu (Note 1) .28 pu (Note 1) “

7 “ “ “ “ “

Notes:

1. This impedance includes the step-up transformer impedance on the generator MVA

bases.

2. Ungrounded wye for generators 1 and 2.

3. Assume generators are connected grounded wye and the generator step-up transformers are connected grounded wye – grounded wye.

Transformers:

Transformers 1 and 2 are 3-phase rated at 350 MVA, 22 kV delta to 345 kV grounded wye, 8% reactance.

Transformers 3 and 4 are 3-phase rated at 400 MVA, 345 kV grounded wye to 230 kV grounded wye, 6% reactance

The template for the report is included in a separate file. Include all the material asked for in the project in the provided template.

Order Solution Now

Our Service Charter

1. Professional & Expert Writers: Homework Free only hires the best. Our writers are specially selected and recruited, after which they undergo further training to perfect their skills for specialization purposes. Moreover, our writers are holders of masters and Ph.D. degrees. They have impressive academic records, besides being native English speakers.

2. Top Quality Papers: Our customers are always guaranteed of papers that exceed their expectations. All our writers have +5 years of experience. This implies that all papers are written by individuals who are experts in their fields. In addition, the quality team reviews all the papers before sending them to the customers.

3. Plagiarism-Free Papers: All papers provided by Homework Free are written from scratch. Appropriate referencing and citation of key information are followed. Plagiarism checkers are used by the Quality assurance team and our editors just to double-check that there are no instances of plagiarism.

4. Timely Delivery: Time wasted is equivalent to a failed dedication and commitment. Homework Free is known for timely delivery of any pending customer orders. Customers are well informed of the progress of their papers to ensure they keep track of what the writer is providing before the final draft is sent for grading.

5. Affordable Prices: Our prices are fairly structured to fit in all groups. Any customer willing to place their assignments with us can do so at very affordable prices. In addition, our customers enjoy regular discounts and bonuses.

6. 24/7 Customer Support: At Homework Free, we have put in place a team of experts who answer to all customer inquiries promptly. The best part is the ever-availability of the team. Customers can make inquiries anytime.

Homework Free Org

Your one stop solution for all your online studies solutions. Hire some of the world's highly rated writers to handle your writing assignments. And guess what, you don't have to break the bank.

© 2020 Homework Free Org