Construction Management & scheduling
Respond to Discussion Responses
S M
Q1: Discuss what resources are most critical for most of the construction projects and how to incorporate the information into the schedule?
There are many ways to make the schedule more effective and they are, Project deliverables, Tasks required to complete the deliverables, Dependencies between tasks, Resources required to complete each task, Task durations and project deadline, Budget of the project, and Planned time for each resource. As well, for incorporate the schedule by monitoring and controlling the schedule and estimate the duration of each of the activities.
Respond
Q2: Discuss one disadvantage that you see in using a linear schedule for a multilevel building project?
The disadvantage of having a linear schedule for a multilevel building is that it will require to re-develop the schedule all the time. It becomes extremely detailed that making the network difficult for the user to visualize and manage even. The exact originals of graphical techniques are not clear and they may have multiple original. As well, the limitation of linear scheduling method is that it assumes that production rates are linear
Respond
M G
1. Discuss what resources are most critical for most of the construction projects and how to incorporate the information into the schedule?
To complete an activity, the CM needs to ensure 3 elements are provided in a timely manner:
Human resources – Meaning the corresponding qualified team needs to enter the site at the intended time.
Equipment – Either the appropriate team or the CM must procure the equipment that will facilitate . This not only refers to the power tools used for a job, but also refers to scaffolding, safety gear etc.
Materials – Meaning the actual construction materials used to build. This goes from steel and concrete to carpentry, flooring, and light fixtures.
Respond
2. Discuss one disadvantage that you see in using a linear schedule for a multilevel building project ?
While multilevel building projects are indeed quite predictable and repetitive, often they are filled with detailing. Other projects that typically employs Linear scheduling , such as highways and roads are heavy on structure but low on detailing such as interior finishes, carpentry etc.
This causes many smaller tasks that come from a multilevel building that need to be registered and accounted for on the linear schedule, making the schedule to become flooded with activities.
This can me it hard to understand and confusing to a team member. The information may not be as easy to access because of the formatting of the chart, as opposed to say a Gantt chart.
Respond
G G
1. Discuss what the recourses are most critical for most of the construction projects and how to incorporate the information into the schedule?
Virtually all projects have limited capacity or resources. Therefore, the success of a project is tied to how well the resources are managed and how well the project is scheduled. The traditional methods of project scheduling have been either the Critical Path Method (CPM) or the Gantt Chart. However, Critical Path Analysis is limited in its assumption the project has infinite capacity. A new method of project scheduling has been proposed the incorporates finite capacity of labor. capital equipment, facilities, and material into its scheduling formula. Resource scheduling incorporates decisions about capacity into the scheduling process using two methods:
Time: constrained and resources constrained. Time-constrained scheduling uses time factors as its critical variable, while resources-constrained focuses on the limited capacity of resources, with emphasis on resolving capacity overload problems.
Respond
Respond to
Discussion Responses
S M
Q1: Discuss what resources are most critical for most of the construction
projects and how to
incorporate
the information into the schedule?
There are many ways to make the schedule more effective and they are,
Project deliverables, Tasks
required to complete the deliverables, Dependencies between tasks, Resources required to complete
each task, Task durations and project deadline, Budget of th
e project, and Planned time for each
resource. As well, for incorporate the schedule by monitoring and controlling the
schedule and
estimate
the duration of each of the activities.
Respond
Q2: Discuss one
disadvantage
that you see in using a
linear schedule for a
multilevel
building
project?
The disadvantage of having a linear schedule for a multilevel building is that it will require to re
–
develop
the schedule
all the time. It becomes extremely detailed that making the network difficult for
the user to visualize
and manage even. The exact originals of graphical techniques are not clear and they
may have multiple original. As well, the limitation of linear scheduling method is that it assumes that
production rates are linear
Respond
M G
1. Discuss what resources are most critical for most of the constructi
on projects and how to incorporate
the information into the schedule?
To
complete an
activity,
the CM needs to ensure 3 elements are provided in a timely manner:
Human resources
–
Meaning the corresponding qualified team needs to enter the site
at the intended
time.
Equipment
–
Either the appropriate team or the CM must procure the equipment that will facilitate .
This not only refers to the power tools used for a
job
, but also refers to scaffolding, safety gear etc.
Materials
–
Meaning the actual construction materials used to build. This goes from steel and concrete
to carpentry, flooring, and light fixtures.
Respond
2. Discuss one disadvantage that you see in using a linear schedule for a multilevel building project ?
While multilevel building projects are indeed quite predictable and repetitive, often they are filled with
detailing. Other projects that typically employs Linear scheduling , such as highways and roads are heavy
on
structure but low on detailing such as
interior finishes, carpentry etc.
Respond to Discussion Responses
S M
Q1: Discuss what resources are most critical for most of the construction projects and how to
incorporate the information into the schedule?
There are many ways to make the schedule more effective and they are, Project deliverables, Tasks
required to complete the deliverables, Dependencies between tasks, Resources required to complete
each task, Task durations and project deadline, Budget of the project, and Planned time for each
resource. As well, for incorporate the schedule by monitoring and controlling the schedule and estimate
the duration of each of the activities.
Respond
Q2: Discuss one disadvantage that you see in using a linear schedule for a multilevel building project?
The disadvantage of having a linear schedule for a multilevel building is that it will require to re-
develop the schedule all the time. It becomes extremely detailed that making the network difficult for
the user to visualize and manage even. The exact originals of graphical techniques are not clear and they
may have multiple original. As well, the limitation of linear scheduling method is that it assumes that
production rates are linear
Respond
M G
1. Discuss what resources are most critical for most of the construction projects and how to incorporate
the information into the schedule?
To complete an activity, the CM needs to ensure 3 elements are provided in a timely manner:
Human resources – Meaning the corresponding qualified team needs to enter the site at the intended
time.
Equipment – Either the appropriate team or the CM must procure the equipment that will facilitate .
This not only refers to the power tools used for a job, but also refers to scaffolding, safety gear etc.
Materials – Meaning the actual construction materials used to build. This goes from steel and concrete
to carpentry, flooring, and light fixtures.
Respond
2. Discuss one disadvantage that you see in using a linear schedule for a multilevel building project ?
While multilevel building projects are indeed quite predictable and repetitive, often they are filled with
detailing. Other projects that typically employs Linear scheduling , such as highways and roads are heavy
on structure but low on detailing such as interior finishes, carpentry etc.
Applied Sciences
Architecture and Design
Biology
Business & Finance
Chemistry
Computer Science
Geography
Geology
Education
Engineering
English
Environmental science
Spanish
Government
History
Human Resource Management
Information Systems
Law
Literature
Mathematics
Nursing
Physics
Political Science
Psychology
Reading
Science
Social Science
Home
Homework Answers
Blog
Archive
Tags
Reviews
Contact
google+twitterfacebook
Copyright © 2021 HomeworkMarket.com
Recent Comments